River revetment materials
Bag materials for bag-type foundation consolidation construction work
Bag materials for foundation consolidation construction work that have the ability to follow changes in the river bottom,
and are able to fit into uneven and irregular parts and gaps.
- Naturnaher Wasserbau (Near-natural river engineering) product
Products Outline
Outline
The Bottle Unit is a double-layer raschel netting structure bag material made from polyester fibers. It can be used by filling with materials such as boulders, broken stones, rag stones and concrete chunks that are generated at the site. The bag shape adequately maintains the ability to follow changes occurring in the river bottom, which is required for revetment foundation consolidation work, and also the ability to fit into gaps, which is required for filling work.
According to the amounts of filling materials, selection can be made from four types of bags containing 1, 2, 3, and 4t.
Characteristics
During installation, the mouth closing part (knot part) does not protrude, so that when installed in rivers the bag shape will not easily become caught up by flotsam.
The bags have outstanding weather resistance, chemical resistance, resistance to cold and heat, and shock resistance.
Due to the double structure net and the 25mm mesh spacing, even if ruptures occur in a number of locations, the structure will prevent the filling materials from escaping.
Because mechanical installation is mainly used both in the filling work and in the placement work, it will be possible to shorten the construction period.
By using underwater lifting jigs, underwater installation will also be simple.

3t bag

Mouth closing part

Temporary working platform (1)

Temporary working platform (2)

River revetment foundation consolidation construction work (1)

River revetment foundation consolidation construction work (2)
Application Example

Revetment and bridge pier foundation consolidation construction work and river bed protection work

Temporary road foundation construction work

Revetment and bridge pier foundation consolidation construction work and scouring prevention
Down Load Catalogues
Enquiry through internet, Request for information material
We are also replying to internet enquiries.
*Marked items are necessary items. Please fill in.